Service confirmé selon la zone à IstanbulDemandes en ligne à tout moment

Renovation & Contracting

Apartment & Home Renovation

Planned, sequenced renewal across a whole apartment or house.

Apartment kitchen mid-renovation with cabinets and counters protected by plastic sheeting and paper

When do you need this?

In older Istanbul apartments and houses alike, the sequence decides the result as much as the workmanship: floors are not laid before services are closed in, and paint does not go on before plaster has dried. We gather every trade into one programme, write the scope room by room and manage the handovers between teams through a single point of responsibility.

  • A newly bought flat that cannot be used as it is
  • The effort of finding and coordinating a separate trade for every job
  • Kitchen, bathroom and floors left over from different eras
  • Wiring that no longer matches the current appliance load
  • A room layout that does not suit how the household lives

What this covers

01

Room schedule and works programme

02

Strip-out, debris removal and surface preparation

03

Renewal of the electrical and plumbing installations

04

Flooring, tiling and skirting

05

Plastering, painting and joinery

06

Coordination of kitchen and bathroom renewal

THE PROCESS

How the work runs

  1. Open a request with room-by-room photos of the flat

  2. On-site survey of existing services, structure and level differences

  3. Written scope per room together with the order of works

  4. Delivery to programme after approval, with each stage photographed

  5. Final check against the room schedule, then handover

Bright apartment living room with grey sofa, burgundy armchairs, walnut shelving and window
Can I live in the flat during the renovation?

It can work when the scope is limited to a single room. Where services, floors and plastering run at the same time, an empty flat makes the work both faster and safer because of dust and shut-offs.

Can internal walls be removed to open up the space?

Only for non-load-bearing walls and within what the building management permits. We establish at survey whether a wall is structural, and propose an alternative where it is.

Can the renovation be split into stages?

Yes. Because the scope is written room by room, wet areas can be planned first and living spaces later; we agree the order together.

Related services

Parlons de votre besoin

Une réparation à planifier ou un espace à transformer ?

Envoyez les informations utiles et notre équipe vous orientera vers le bon parcours.

WhatsApp · +90 539 609 51 11Districts prioritaires actifs · Autres zones sur confirmation

WhatsApp