Skim coat, sanding, priming and painting
Renovation & Contracting
Finishing Works
Surfaces, doors, skirting and final touches once the rough works are done.

When do you need this?
Finishing is the most visible stage of a renovation and the easiest to damage: a freshly painted wall can be scuffed by the ladder of a team that arrives afterwards. After the rough works, or in new and unfinished units, we tie surface preparation, fitting and touch-ups into a clear sequence, protect finished surfaces, and carry out the final check under raking light against a snagging list.
- Rough works finished, yet the flat is still not ready to live in
- Waves and sanding marks showing on painted walls when light hits them
- Gaps and misalignment at skirting, door frames and architraves
- Later trades scratching and marking finished surfaces
- Untidy sealant lines, with socket plates and light fittings still missing
What this covers
Skirting, door frames, interior doors, architraves and trims
Silicone and sealant work
Switch plates, socket covers and light fittings, fitted with the electrician
Touch-ups and surface checks under raking light
Protection of finished surfaces and a snagging list
THE PROCESS
How the work runs
Open a request with photos of the current state and the completed rough works
On-site survey of surface flatness, moisture, frame dimensions and missing fittings
Written scope covering work items, materials and the order of trades
Delivery after approval, with finished surfaces protected from later work
Raking-light inspection, snagging list closed out, then handover

Where we deliver this service
Appointments are planned around district routes. If your district is not listed, write to us anyway and we will assess the scope together.
FAQ
Questions about this service
When can finishing works start?
Once the plumbing and electrical runs are closed in and tested, and plaster and screed have dried sufficiently. Paint applied to a damp surface can blister, so we check surface moisture at survey and build any waiting time into the programme where needed.
Why are surfaces checked under raking light?
Diffuse light from the ceiling hides small waves and sanding marks, while light directed across the surface from the side reveals them. Carrying out this check before the final coat means touch-ups are made at the right moment, and the same flaw does not appear later in daylight.
How is the order agreed with the electrician and other trades?
The general rule is to leave until last anything that later work could damage: switch and socket plates, light fittings and silicone usually go in after the final coat of paint. We set this order out in writing in the scope and protect finished floors and surfaces with sheeting and tape.
Related services
Painting & Decoration
Surface preparation, interior painting and decorative wall finishes.
Request this serviceTurnkey Renovation
One responsible team and one written scope, from survey to handover.
Request this serviceREADY TO START
Send one photo and let us plan the rest.
No account is needed and there is no payment in the form. Your request reaches the EVİZO office directly.
WhatsApp · +90 539 609 51 11Priority districts active · Other areas by confirmation